Demolition

Plant checks and hot work steps that hold up on a changing site.

A demolition site changes every day and the crew often includes agency operatives on their first shift. Subtilitas puts the pre-start check on the excavator and the cutting steps on the cylinder cage, so the procedure is in front of whoever turns up.

01 Where it helps

Where it helps demolition contractors

Pre-start plant checks

A guide on each machine and attachment, with a photo of what a good check looks like, including the quick hitch locking pin in place.

Hot cutting

Set-up, cutting and fire watch steps at the cylinder cage, every time.

Agency operatives

Someone on their first day follows your procedure without waiting for the foreman. The app's menus come in English, Polish and Romanian.

Records for the principal contractor

Show who checked which machine and when. On the Site plan, export it all to CSV.

02 Guides to start with

Guides demolition crews put on the plant

Examples of guides you might write, from your own method statements or the manufacturer's manuals.

  • 360 excavator pre-start check
  • Quick hitch attachment change and bucket test
  • Oxy-fuel cutting set-up and shutdown
  • Dust suppression set-up
  • Exclusion zone set-up for high-reach work
  • Breaker and cut-off saw pre-use checks

Final step: sign off

Put the first check on one machine for 30 days.

Every worker on site is included in the price, however often the crew changes.